Avalon will be repaving our surface roads as well as parking lots in various stages from July 20th – August 5th 2025.

Repaving schedule below:

  • July 20th at 9pm – July 22nd at 6am: 1st Street and Eastside of 6000 Parking Lot
  • July 21st at 9pm – July 23rd at 6am: East side of Arhaus Lot and North Deck North Surface Lot
  • July 22nd at 9pm – July 24th at 6am: Westside of Arhaus lot and Westside of 6000 lot
  • July 23rd at 9pm – July 25th at 6am: South lot of Whole Foods and South lot of Container Store
  • July 24th at 9pm – July 26th at 6am: Strip by Container Store and Southside of 7000 Surface Lot
  • July 26th at 9pm – July 28th at 6am: Parkdale Lane and PNC Bank
  • July 27th at 9pm – July 29th at 6am: Northside Container Store Northside 7000 Surface Lot
  • July 28th at 9pm – July 30th at 6am: 3rd Street Entrance and Northside of Whole Foods Surface lot
  • July 29th at 9pm – July 31st at 6am: Phase 1 Blvd
  • July 30th at 9pm – Aug 1st at 6am: Phase 2 Blvd and Southside of 1st Street
  • Aug 3rd at 9pm – Aug 5th at 6am: 2nd Street and South Parking Deck Surface Lot
  • Aug 4th at 9pm – Aug 6th at 6am: 3rd Street Entrance and Northside of Whole Foods Surface lot
  • Aug 5th at 9pm – Aug 7th at 6am: 1st Street Central and Avalon Way

 